Vancouver, British Columbia – June 12, 2018 – A.I.S. Resources Limited (TSX: AIS, OTCQB: AISSF) (the “Company” or “AIS”) announces it has completed two -90 degrees dip HQ diameter, diamond drill holes for a total of 757 metres, and 21 trenches with depths of 4-4.5 metres in its Pocitos concessions at its Chiron project in the eastern area of the Pocitos Salar. Economic cut-off values were set at 250ppm and 8:1 for Mg:Li values. All DDH hole and pit samples failed this test. The exploration team decided not to continue with the drilling program and exploration work. The Company decided not to exercise the property option which was extended by the vendor until receipt of assay results.   Our QP, Phillip Thomas supervised the drill program, sampling and analysis.

Lithium was present in the DDH brine samples taken using a double packer system and were analysed by Alex Stewart Laboratories in Jujuy, Argentina. Two core samples have been sent to GeoSystems Analysis Inc in Tucson, Arizona for specific brine yield measurements, porosity and permeability.

AIS-Resources-Chiron-Drilling-Results-01

Fig 1 – location of trench pits and drill holes in Pocitos One concession.

Our interpretation of the geophysics was accurate with a major aquifer being encountered at 16m within a black sand unit, indicated by a significant drop in resistivity and at depth where a brown clay unit had transitioned into a coarse sandy unit with halite. High resistivity was correlated to solid halite units with almost no porosity. Significant brine flows at very high pressures were encountered at depth in both diamond drill holes with estimated flow rates of 50,000-70,000 litres per minute. In the case of DDH PO2, the brine flowed under its own pressure for approximately 5.25- 5.5 hours.

AIS-Resources-Chiron-Drilling-Results-02

Fig 2 Brine from DDH PO1 • Fig 3 Brine from DDDH 2
Fig 4 Pit with brine (upper right corner) • Fig 5 DDH Core showing Black sand unit at 16M (lower right corner)

The results of the double packer (closed downhole sampling) DDH and pit tests are as follows:

Pocitos One – DDH Hole 1
All Values in ppm (parts per million) 100,000 ppm=10% , -90 degrees dip.
Latitude  24˚ 28’ 40.34”S • Longitude 67˚ 01’ 25.01”W

Sample No Density Li Ca Mg B Na K Sr Strontium Mg:Li Ratio
Accuracy

Mg/L ICP

0.05 0.025 0.05 0.05 0.1 0.2 0.01
PO1 1.211 66 788 1111 89 116571 2375 18.17 16.8:1
PO2 40 1197 22 740 116957 1816 27.37 0.55:1
PO3 59 1010 1237 47 113729 2139 23.41 21.0:1
PO4 66 660 1006 105 117887 2475 16.02 15.2:1
PO5 76 588 1100 131 116127 2630 13.05 14.5:1
PO6 1.213 88 581 1258 145 116147 2846 11.73 14.3:1

Pocitos One – DDH Hole 2
All Values in ppm (parts per million) 100,000 ppm=10%, -90 degrees dip.
Latitude  24˚ 28’ 38.59”S • Longitude 67˚ 01’ 00.82”W

Sample No Li Ca Mg B Na K Sr Strontium Mg:Li Ratio
Accuracy

Mg/L ICP

0.05 0.025 0.05 0.05 0.1 0.2 0.01
PO2-1 39 1229 758 25 115894 1866 27.12 19.4:1
PO2-2 74 1140 1547 62 106605 1600 23.62 20.9
PO2-3 112 1133 2144 88 103995 1568 20.88 19.1:1
PO2-4 126 1067 2521 111 94408 1392 19.23 20.0:1
PO2-5 95 601 1447 123 116064 2468 12.88 15.23

Pits
All Values in ppm (parts per million) 10,000 ppm=1%.
Depth 4.0m-4.5m

Pit No Li Ca Mg B Na K Sr Mg:Li
1 22 692 313 31 55,784 998 13.94 15:1
2 No brine
3 65 307 322 209 121722 3201 5.58 4.95
4 No brine
5 45 267 349 53 119763 1623 5.90 7.75
6 No brine
7 72 494 1131 141 116172 2467 9.79 15.7:1
8 76 484 1170 131 118995 2646 10.06 15.4:1
9 78 572 1207 132 116594 2469 10.08 15.5:1
10 179 310 482 316 116856 6375 10.01 2.69
11 80 179 538 1251 116746 2558 10.03 6.72

Pocitos 7
Pits (All Values in ppm (parts per million) 10,000 ppm=1%)
Lat 24˚ 34’ 11.57”S • Long 67˚ 00’ 50” (Pit 12)

Pit No Li Ca Mg B Na K Sr Mg:Li
12 72 497 1183 168 118450 2514 9.56 16.4:1
13 72 473 1156 163 115698 2460 8.89 16.0:1
14 73 467 1178 159 121693 2457 8.97 16.1:1
15 65 453 1011 112 121450 2305 8.75 15.6:1
16 68 468 1088 139 119398 2413 8.85 16.0:1

Pocitos 9
Pits (All Values in ppm (parts per million) 10,000 ppm=1%)
Lat 24˚ 35’ 52.86” • Long 66˚ 59’ 20.62” (pit 17)

Pit No Li Ca Mg B Na K Sr Mg:Li
17 75 461 1158 148 119869 2587 8.93 15.4:1
18 71 468 1097 126 121774 2612 9.47 15.5:1
19 107 407 1508 143 118643 3629 8.17 14.1:1
20 113 391 1565 143 120195 3815 17.26 13.8:1
21 73 733 480 64 35020 1608 19.53 6.6:1

Interpretation
Both drill holes intersected substantial localized aquifers, however sampling downhole using a double packer tool at 50 metre intervals showed that the lithium values were uneconomic and also the magnesium values were extremely high.  Economic cut-off values were set at 250ppm and 8:1 for Mg:Li values.

The geohydrological work on the surface showed that the lithium values in some of the pits with low Na values increased substantially in Lithium and Sodium values over a 7 day period suggesting that surface water drained through the shallow brown sandy clay and black sand unit that had higher porosity due to the sand content, and more lithium rich brines flowed in that had been trapped in the higher density lower clay units.  The brine density differential wasn’t measured but the low Na and Li values suggest these surface brines were lower density.

Pit 16 and 19
Was sampled within 12 hours of being dug and then again in 7 days.

Pit No Li Ca Mg B Na K Sr
16 1 801 41 3 1806 71 4.71
16 -7 days 71 468 1097 126 121774 2612 9.47
19 1 655 84 17 3861 89 7.55
19 – 7 days 107 407 1508 143 118643 3629 8.17

The black sand unit that occurred about three metres below the surface predominately in the central salar area showed substantial porosity and transmissitivity.  In DDH 1, 10 metres of black sand core was lost from the drill rod  below the 16 metre interval confirming substantial brine presence, but it was low in lithium concentration.  The Pocitos Salar was subjected to substantial rainfalls during December to March 2018 and this impacted surface brine concentration.  The highest lithium pit value was 179ppm in Pit 10 on the eastern most edge of Pocitos 2.    No evaporation studies were undertaken but anecdotal evidence suggests that 3-5cm of water had evaporated over the 30 day drill period.

The geological model adapted from the geophysics survey suggests that brine concentrates to the eastern edge but is stratified by less porous halite and clay units.  A cemented aggregate sand sequence was intersected above the brine aquifer at 320-325m in DDH1.  Other explorers have confirmed this model in that brines sampled in the west had little or no lithium. We took the view that considering the lithology, deeper drilling had a low probability of intersecting higher lithium grades.

AIS-Resources-Chiron-Drilling-Results-03

Fig 6  Black Sand unit • Fig 7 Black sand transitioning to  Halite Unit

Quality Control and Assurance
Alex Stewart International Argentina SA completed the sample analysis using an ICP diagnostic machine.  Three samples were submitted  in a group of six, and every 10 in 20 for quality control.  The variance was 2.5% or less in the lithium analysis, which reflected the variance in brine sampling.  ICP machine variance accuracy was 0.05%.

Pit and DDH Packer Sampling Quality Control
Each bottle was rinsed in brine. A sampling tool was used to ensure that minimum disturbance was created and the clay sediments were not disturbed. A sample was taken and the cap put on the 1 litre bottles with no air present.  The temperature was taken and recorded that was  approximately 6.5˚C.  The bootle was labelled PO1 or PO2 and then sealed with tape.  The QP checked the labelling and recorded it and the site geologist took all the samples to Alex Stewart Laboratories.  They sent a confirmation of the date, time and labels of the samples that were received and that they were still sealed.

Guayatayoc Update
The company has received the date for its UGAMP (La Unidad de Gestión Ambiental Minera Provincial) meeting slated for July 2nd, 2018.  The proposed meeting is for the ratification of our proposed drilling and exploration program at Guayatayoc. The process involves community consultation with government and representatives of AIS.

Once the meeting is complete,  a 30 day period for consultation is required, during which time AIS may be requested to provide further information of its planned work program.  If no objections are made, the permit will be issued.

Qualified Person
Phillip Thomas, BSc Geol, MBusM, MAIG, MAIMVA, (CMV), a Qualified Person as defined under NI-43-101 regulations, has reviewed the technical information that forms the basis of this news release, and has approved the disclosure herein. Mr. Thomas is not independent of the Company as he is an officer and shareholder.

About A.I.S. Resources
A.I.S. Resources Ltd. is a TSX-V listed investment issuer, was established in 1967 and is managed by experienced, highly qualified professionals, who have a long track record of success in lithium exploration, production and capital markets. Through their extensive business and scientific networks, they identify and develop early-stage projects worldwide, that have strong potential for growth with the objective of providing significant returns for shareholders. The Company’s current activities are focused exclusively on the exploration and development of lithium brine projects in northern Argentina.

On Behalf of the Board of Directors,

AIS Resources Ltd.
Marc Enright-Morin, President and CEO

Corporate Contact
A.I.S. Resources Limited
Marc Enright-Morin
President and CEO
T: 778-892-5455
E: memorin@aisresources.com
W: www.aisresources.com

ADVISORY: This press release contains forward-looking statements. More particularly, this press release contains statements concerning the anticipated use of the proceeds of the Private Placement. Although the Corporation believes that the expectations reflected in these forward-looking statements are reasonable, undue reliance should not be placed on them because the Corporation can give no assurance that they will prove to be correct. Since forward-looking statements address future events and conditions, by their very nature they involve inherent risks and uncertainties. The intended use of the proceeds of the Private Placement by the Corporation might change if the board of directors of the Corporation determines that it would be in the best interests of the Corporation to deploy the proceeds for some other purpose. The forward-looking statements contained in this press release are made as of the date hereof and the Corporation undertakes no obligations to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.